P3 Logistic Parks WH11 Rehabilitation and Full Fitout – Chiajna
More than 1.200 sqm of office, looker rooms, meeting rooms, social rooms and circulation zones full construction and fitout.
- gypsum wall configuration, finishing, painting and wall ceramic tiles,
- floor configuration with booth ceramic tiles and parquet floor tiles,
- ceilings configuration with Armstrong suspended system,
- inside metallic Hormman doors and accessories,
- aluminium joinery outside windows with sills and accessories included,
- facade painting and reconfiguration,
- HAVC equipment and installation with multisplit air conditioning units and condensing gas boiler network,
- sanitary installation works, equipment and accessories,
- electrical installations and equipment and lighting,
- firefighting network and fire detection.
Type of Service: General Contracting