q
TKM TEKNOLLOGIK MANAGEMENT
187 Viitorului st., S2
20618 /Bucharest, RO
(+40) 374-655-398

P3 Logistic Parks WH11 – Chiajna

Project Description

P3 Logistic Parks WH11 Rehabilitation and Full Fitout – Chiajna

More than 1.200 sqm of office, looker rooms, meeting rooms, social rooms and circulation zones full construction and fitout.

  • gypsum wall configuration, finishing, painting and wall ceramic tiles,
  • floor configuration with booth ceramic tiles and parquet floor tiles,
  • ceilings configuration with Armstrong suspended system,
  • inside metallic Hormman doors and accessories,
  • aluminium joinery outside windows with sills and accessories included,
  • facade painting and reconfiguration,
  • HAVC equipment and installation with multisplit air conditioning units and condensing gas boiler network,
  • sanitary installation works, equipment and accessories,
  • electrical installations and equipment and lighting,
  • firefighting network and fire detection.

 

Type of Service: General Contracting

 

Project Details
Category

Logistic

Client

P3 Logistic Parks

Location

Chiajna, Romania

Previous
Next